Skip to Content
DSC_0085

Products & Services

Originally introduced as a pull-in-place method of installing cured-in-place pipe, the Inliner product is now installed using direct inversion as well as the pull-in method.  As an innovator in the CIPP industry, we have developed specialized equipment to expedite both methods of installation while maintaining our attention on installing a high quality product.  The curing process can be completed by either hot water or steam/hot air which allows for versatility when scheduling projects, crews and equipment to complete each CIPP project.

This transformation of a soft, flexible felt tube to a thermoset resin-impregnated liner and finally to a cured structural liner within the existing pipe is a process for which our crews and project managers have been highly trained to ensure compliance with the owner’s required specifications.

For more information and details regarding CIPP, please view our video here.